5 min read

本文目前只有英文版。 查看英文原文

Weekly development log 2026‑W19: Rebuilding Providers, Models, and Interfaces

  • Weekly log
  • Vibe coding
  • Self-hosted AI
  • 2026-W19
One model gateway branching to local inference and optional external models. A conceptual illustration generated on 2026-10-11, not a product screenshot. It explains this week's theme and does not establish a historical deployment screen or current operational state.

HISTORICAL DEVELOPMENT / EVIDENCE

This week in OpenMake

Development velocity increased significantly in early May. We revamped provider integrations, model selection, brand presentation, and the main chat screen to connect the matured backend to a product users can understand.

Period
2026-05-04 – 2026-05-10
Git commits
141
Evidence
Git history

01

Full-history review and additions

Model presets and selection UI changed alongside chat model controls. Keep-alive and classifier settings provide latency controls; this record does not establish general speedup figures.

All reachable history of main 0641c480 was rechecked on 2026-10-18. Counts use committer dates from Monday 00:00 through Sunday 23:59:59 KST, including merges, releases and distinct parallel-branch commits. Commit counts are not feature counts. Tests and operational measurements below are historical source records, not evaluations rerun for this refresh.

02

What changed

  • Expanded external provider and model configuration.
  • Redesigned model selection and chat UI.
  • Aligned branding and interface behavior across the product.

证据来源

Evidence

OPENMAKE · MIT OPEN SOURCE

返回开发日志