5 min read

本文目前只有英文版。 查看英文原文

Weekly development log 2026‑W06: OpenMake LLM Appears in Git History

  • Weekly log
  • Vibe coding
  • Self-hosted AI
  • 2026-W06
An engineering desk reviewing a product map and data/model connections. A conceptual illustration generated on 2026-10-11, not a product screenshot. It explains this week's theme and does not establish a historical deployment screen or current operational state.

HISTORICAL DEVELOPMENT / EVIDENCE

This week in OpenMake

On February 3, the first commit for OpenMake LLM 1.5.0 was recorded. The design explorations from January have become a milestone in the codebase that anyone can revisit.

Period
2026-02-02 – 2026-02-08
Git commits
1
Evidence
Sessions + Git

01

Full-history review and additions

The first 1.5.0 commit was authored February 3 and committed February 12. This week and W07 use author dates to preserve the original development chronology.

All reachable history of main 0641c480 was rechecked on 2026-10-18. Counts use author dates from Monday 00:00 through Sunday 23:59:59 KST, including merges, releases and distinct parallel-branch commits. Commit counts are not feature counts. Tests and operational measurements below are historical source records, not evaluations rerun for this refresh.

Session-derived explanations are retained from the earlier archive retrospective. This refresh reviews public Git source and does not claim a fresh investigation of the original local conversations.

02

What changed

  • Created the first restorable repository checkpoint.
  • Established the product identity as an AI assistant platform.
  • Determined the scope actually implemented based on the commits.

证据来源

Evidence

OPENMAKE · MIT OPEN SOURCE

返回开发日志